One Workshop, Every Panel Your Project Needs
White Dream builds electrical panels entirely in-house in Saudi Arabia — from a single automatic transfer switch to fully synchronized generator control systems. Every ATS, MDB, SMDB, MCC, PCC, PLC and VFD panel is engineered to your project's code, precision-wired and factory load-tested before dispatch. No subcontracting — just certified, ready-to-install panels for any plant room.

Engineered To Your Load
01Single-line diagrams and load calculations prepared before a single panel is built.
Factory Acceptance Tested
02Every panel is tested under load with a signed FAT report before dispatch.
Full Installation Service
03Our own crews deliver, wire and commission every panel on-site.
24/7 Technical Support
04Engineers reachable for troubleshooting long after handover.
1-Year Workshop Warranty
05Every panel is backed by a full 1-year warranty on materials and workmanship.
A Panel For Every Point In Your Power System
From the incoming supply to the final circuit, we design and build every panel type your project needs — each one engineered, wired and tested to the same in-house standard.

From Single-Line Diagram To Finished Panel
A reliable panel starts on the drawing board, not the workshop floor. Our electrical engineers review your load schedule, prepare single-line diagrams and short-circuit calculations, and select breakers, busbars and components sized correctly for your site — not oversized for margin or undersized to cut cost. Every design is reviewed against IEC and SASO requirements before fabrication begins, so the panel that reaches your site matches the drawing that was approved.
- Single-line diagrams and load calculations prepared in-house
- Components sized and selected to IEC & SASO standards
- Drawings approved with you before fabrication starts
From Approved Drawing To Tested Panel In Five Steps
The same in-house team handles every step of manufacturing — no subcontracted fabrication, no handoffs between workshops, and one point of contact from design approval to final delivery.
Design & Approval
We prepare the single-line diagram, load calculations and general arrangement drawing, and get your sign-off before any material is cut.
Enclosure Fabrication
Our workshop fabricates the enclosure to the approved dimensions and ingress protection rating your site requires.
Component Assembly & Wiring
Breakers, busbars, meters and control devices are mounted and wired by our own electricians to the approved schematic.
Factory Acceptance Testing
Every panel undergoes insulation, functional and load testing, with results recorded in a signed FAT report.
Delivery & Commissioning
Our own crews deliver, position and wire the panel on-site, then commission it and hand over the full documentation.
A Panel Built To The Drawing You Approved
No surprises between the design stage and the finished product — what you sign off is exactly what gets fabricated, wired and tested.
- Single-line diagrams and drawings shared before fabrication
- Signed factory acceptance test report with every panel
- 24/7 emergency response for the life of the panel
Every Panel Proven Before It Leaves Our Workshop
A panel that looks correct is not the same as a panel that is proven correct. Before any unit leaves our facility, it goes through insulation resistance testing, functional testing of every breaker and control circuit, and a full load test where the panel type requires it. Results are recorded against the approved drawing in a signed factory acceptance test (FAT) report, so you receive documented proof of quality alongside the physical panel — not just a verbal assurance.
- Insulation resistance & dielectric strength testing
- Functional testing of every breaker, relay & control circuit
- Signed FAT report issued with every panel at handover
- Backed by a full 1-year workshop warranty on every panel


When Standard Panels Won't Fit
Not every site fits a catalog panel. Unusual enclosure dimensions, specialized control logic, integration with existing switchgear, or a load profile that doesn't match a standard configuration — these are the projects our custom panel team is built for. We design around your exact constraints, fabricate the enclosure and internals to match, and test the finished panel exactly as we would any standard build, so a bespoke panel never means a compromise on quality.
- Bespoke enclosure sizing & specialized control logic
- Integration with existing generators, ATS or BMS systems
- Same factory testing standard as every standard panel
Panels Built For Every Site Type
From a single distribution board in a retail unit to a synchronized multi-generator control room in a factory, our engineering and manufacturing teams are equally at home on any of these site types across Saudi Arabia.

Commercial Sites
Malls, hotels & mixed-use developmentsDistribution Panels For Occupied Buildings
MDB, SMDB and distribution boards sized and installed without disrupting tenants, guests or shoppers.

Construction Projects
Temporary & permanent site powerPanels That Scale With Your Site
Temporary distribution panels that upgrade to permanent MDB and SMDB systems as the build progresses.

Government & Infrastructure
Public facilities & critical infrastructureDocumented Panels For Public Facilities
Fully documented, code-compliant panels for infrastructure and public-sector sites where a clean paper trail matters.

Industrial Facilities
Factories & continuous critical loadsHeavy-Duty Panels For Continuous Loads
MCC, PCC and synchronization panels sized for factories and plants running around the clock.

Oil & Gas Sites
Remote sites & field operationsPanels Built For Remote Deployment
Container-mounted and enclosure-rated panels transported and commissioned at remote field locations.

Events & Festivals
Container & temporary distribution panelsRapid Distribution For Temporary Sites
Container-based distribution panels deployed quickly for stadiums, festivals and multi-day events.
Electrical Panels At Work Across The Kingdom
A few recent panel manufacturing and installation projects — from single distribution boards to complete synchronized control rooms. See the full case studies on our projects page.




Electrical Panel Manufacturing — Common Questions
Quick answers about ordering a panel from White Dream. For anything else, our team is one call or message away.
We manufacture the full range of low-voltage panels used across Saudi Arabia's industrial, commercial and infrastructure projects, including ATS, MTS, MDB, SMDB, distribution boards, MCC, PCC, generator control and synchronization panels, PLC and VFD panels, capacitor bank and metering panels, motor control panels, and fully custom builds engineered to your load schedule.
Yes. Every panel is designed and fabricated to the relevant IEC and SASO standards, with single-line diagrams, load calculations and factory acceptance testing documented before delivery.
Absolutely. Our engineering team regularly builds fully custom panels where standard configurations don't fit the site, load or code requirement — from unusual enclosure sizes to specialized control logic.
Lead time depends on panel type and complexity. A standard ATS or distribution board typically ships in 2 to 3 weeks, while large MCC, PCC or synchronization panel systems may take 4 to 8 weeks. We confirm an exact schedule in writing after reviewing your single-line diagram.
Yes. Our own technicians deliver, install, wire and commission every panel we manufacture, and can integrate it with existing generators, transfer switches or building management systems.
Yes. Every panel we manufacture is covered by a full 1-year workshop warranty against defects in materials and workmanship, on top of the individual manufacturer warranties that already cover major components such as breakers and control devices.
