Al Kharj Factory 8MW generator installation by White Dream Al Kharj, Riyadh Province
01
Case Studyof 04

Al Kharj Factory: 8MW Power Supply

The Challenge: 8MW of power with zero room for downtime, and a partner for the long term.

Our Solution: Supplied, installed and synchronized a multi-generator system for the full load, tested under real conditions, backed by a 5-year maintenance contract.

8MW Total Capacity 5-Year Maintenance Contract Full Synchronization
  • 8MW multi-unit generator bank, synchronized to run in parallel
  • The Result: Zero downtime since day one, 5 years of maintenance keeping the plant covered
02
Case Studyof 04

Jubail Station: 3-Year Standby Contract

The Challenge: A Jubail fuel station needed reliable backup power and one point of contact for a multi-year deal.

Our Solution: Installed a sized standby generator, backed by a 3-year contract with scheduled visits and a technician always on call.

3-Year Contract Term Standby Power 24/7 Coverage
  • Standby generator sized for continuous station operation, plus 3 years of scheduled maintenance
  • The Result: The station never lost power, one team responsible for the entire contract
Jubail Station standby generator installation by White Dream Jubail, Eastern Province
National Dialogue Center power coverage by White Dream Riyadh
03
Case Studyof 04

National Dialogue Center

The Challenge: A national landmark needed guaranteed power for National Day and Founding Day, plus year-round backup, under one long-term deal.

Our Solution: Standby and event-day power on a 4-year contract, tested and confirmed ready before every national occasion.

4-Year Contract National Occasion Coverage Zero-Blackout Standard
  • Dedicated standby power, with readiness checks before National Day & Founding Day
  • The Result: Power never went out for a single national occasion
04
Case Studyof 04

Abdullah Al Othaim Markets

The Challenge: A major Saudi retail chain needed emergency power fast to avoid closing the store.

Our Solution: A generator on-site the same day, connected safely, with a technician on standby until permanent power was restored.

Same-Day Response Emergency Power Retail Sector
  • Emergency generator connected the same day, technician on standby until power was restored
  • The Result: The store never closed and never lost a single sale
Abdullah Al Othaim Markets emergency generator by White Dream Riyadh
Our Standard, Not An Exception
Why Our Projects Stand Out

The Same Rigor, Every Job

Every project, big or small, runs on the same six commitments below.

Engineering-Led Scoping
Every site assessed and sized by qualified engineers first
01
In-House Equipment
Generators, panels and fuel tanks are our own, nothing subcontracted
02
Fast, Nationwide Mobilization
Crews and equipment reach any site across the Kingdom, fast
03
Full Load-Bank Testing
Every installation tested under real load before handover
04
Long-Term Accountability
The same team stays responsible long after handover
05
One Point Of Contact
First site visit to ongoing support, one team, no handoffs
06
Frequently Asked Questions

Your Project Questions, Answered

Quick, straight answers to what people ask most before starting a project with us.

Yes. Everything on this page is real work we've done. Just ask, and we'll share more examples from your industry.

Any size. From one generator for a home to an 8MW factory setup, our five in-house divisions handle it all.

Yes. We've worked in Riyadh, Jubail, Al Kharj, Dammam, Khobar, Jeddah and more, our crews travel anywhere in the Kingdom.

It depends on the job. A standby generator can be on-site the same day. Bigger work, like panels or tanks, gets a clear schedule before we start.

Yes. Every installation is tested under real load, and you get a full report for your records or safety audits.

Message us your site, what you need and your rough timeline, on the contact page or WhatsApp. We'll follow up fast with a free assessment and quote.

Ready To Power Your Next Project?

Tell us your site, timeline and load requirements, our engineers will scope the right generators, panels and fuel tanks, and respond within 24 hours.

Get A Free Site Assessment

24/7 Support

We're always on call for your site needs.